Project Info
The client had recognised the need for an assessment of the Tanker Washing Process within their 14-stage single series production line. The TWP was a critical asset within the production process and had been identified as one of the contributors to the production backlog due to the unavailability of the TWP itself. Most stages of the production line did have ‘buffer’ capacity between stages, except for the TWP.
The Tanker Washing Process was used for cleaning finished products before the next stage of the production process which was component painting.
Solution
It was agreed to perform an RCM (Reliability Centred Maintenance) study on the TWP in order to recognise the modes of failure and contributors to the unavailability losses.
An improvement team made up of an electrical technician, mechanical technician, quality technician and plant operator were brought together to perform the study.
The process began with a failure mode and effects analysis (FMEA) that identified the TWP failure modes in a systematic and structured manner. The team then examined each failure mode to determine the optimum maintenance policy to reduce the severity of each failure.
The chosen maintenance strategy considered the cost, safety, environmental and operational consequences. The effects of redundancy, spares costs, maintenance crew costs, equipment ageing, and repair times were also considered.
Once the optimal maintenance policies had been identified within the RCM process, the team were then able to see the performance predictions and costs, expected spares requirements and maintenance crew manning levels.
The optimised strategy was signed off and uploaded into the CMMS (Computerised Maintenance Management System)
Results
The optimised maintenance strategy was also used to determine several outputs including:
- Maintenance Budget Analysis
- Safety Criticality
- Top Ten Failure Mode
- Availability Prediction
Conclusion
The implementation of the recommended maintenance strategy will reduce business effects by minimising losses to production through unplanned outages and increase plant availability.
With a combination of simple methodologies and practical training delivery, Pro-Reliability Solutions support Asset and Continuous Improvement Managers to proactively manage their assets and ensure their equipment delivers the required level of availability while minimising risks to the business.
Whether it is a new project in the design phase or an existing facility that needs improvement, Pro-Reliability Solutions can help customers realise bottom-line results.
This Reliability Study was performed using Isograph Availability Workbench Software.
Further Information
If you are interested in performing a Reliability Maturity Self-Assessment at your facility or would like to develop a roadmap for your Reliability future, then please get in touch.